Contractor Time-Cost Calculator

Add up the office side of contracting: the estimates you write each week, the scheduling and admin, and the job-cost tracking. See the total per week and per year — and, only if you supply an hourly value for your time, what those hours are worth.

Inputs

The whole task: takeoff, pricing, and writing the proposal.

Optional — leave at 0 and the tool reports hours only, no dollar figure.

Results update as you type. Nothing is sent anywhere — the math runs in your browser.

Result

You currently estimate spending approximately 520 hours/year on these activities.

You currently estimate spending approximately 520 hours/year on these activities.

Estimated quantities from your inputs
Current administrative hours per week10.0hrs
Current administrative hours per year520hrs

See how Drevanto is designed to reduce repetitive estimating and contractor administration.

Formula

  • estimate hours/week = estimates per week × average minutes per estimate ÷ 60
  • current admin hours/week = estimate hours/week + scheduling/admin hours + job-cost/admin hours
  • hours/year = current admin hours/week × 52
  • annual labor value = hours/year × hourly value (only when an hourly value is supplied)

Assumptions

  • 52 working weeks per year — vacations and slow seasons are not netted out.
  • Minutes per estimate covers the whole estimating task, from takeoff to a sendable proposal.
  • The hourly value is whatever you decide owner/admin time is worth — the tool never invents one.

What this does not cover

  • This totals the time you report spending today. It does not predict what any software will do to those numbers.
  • Office time only — there is deliberately no production-rate, crew-size, or field-labor math here.
  • Planning aid only; not a quote, not a benchmark measurement, and not a promise about the future.

Planning aid only — not a quote. Quantities use documented rules of thumb; verify against your plans, local codes, site conditions, and real supplier pricing before ordering or bidding.

Methodology

This tool is pure addition over numbers you report. Estimate time converts to hours (estimates per week times average minutes each, divided by 60), then adds your scheduling/admin and job-cost/admin hours for a current weekly total. Multiplying by 52 gives the annual figure. The dollar figure appears only when you supply an hourly value — the tool never assumes what your time is worth. It deliberately contains no production-rate, crew-size, or field-labor math; it measures office time, and it makes no claim about what any software would do to these numbers.

Worked example: 5 estimates/week at 60 min each, 3 scheduling hrs, 2 job-cost hrs

  1. Estimate time = 5 × 60 ÷ 60 = 5 hrs/week
  2. Current admin = 5 + 3 + 2 = 10 hrs/week
  3. Per year = 10 × 52 = 520 hrs/year
  4. Optional value at $75/hr = 520 × 75 = $39,000/year

Frequently asked questions

Does this tool promise Drevanto will reduce these hours?

No. It totals the time you report spending today — nothing more. There is no percentage reduction and no promised outcome here. If you want to see what Drevanto's certified Instant assemblies actually measured, the benchmark is published with its full methodology on the Benchmark page.

Where do I get an honest minutes-per-estimate number?

Time yourself on the next few estimates, from opening the plans or scope notes to a sendable proposal — including the takeoff, pricing lookups, and revisions. Most contractors underestimate because they only count the writing, not the measuring.

Why is the hourly value optional?

Because only you know what an hour of owner or office time is worth to your business. Leave it at zero and the tool reports hours only — it will not invent a dollar figure for you.

Certified benchmark · 2026-08-21

In 520 certified profile-mode generations across 26 supported Instant assemblies on Windows (profile/AOT) and an Android API 36 emulator, supported jobs became editable estimates in a median of 0.028 seconds (rounded); the measured 95th percentile was 48.008 milliseconds (approximately 0.048 seconds), with 0 generative-AI provider calls.

median, supported jobs
0.028 sec
certified generations
520
supported assemblies
26
failures · 0 AI provider calls
0

Certified supported jobs only. Editable output; contractor pricing and field verification remain in control. Full methodology and results

See it run on your own jobs

The private Drevanto beta is the real, editable product — not a website demo. Apply, and we will follow up by email.