Concrete incl. overage2.72cu yd
60 lb bags (alternative)163bags
80 lb bags (alternative)123bags

Formula

  • cubic yards = (length × width × thickness ÷ 12) ÷ 27 × (1 + overage)
  • 60 lb bags = ceil(cubic feet incl. overage ÷ 0.45 cu ft per bag)
  • 80 lb bags = ceil(cubic feet incl. overage ÷ 0.60 cu ft per bag)

Assumptions

  • 0.45 cu ft yield per 60 lb bag and 0.60 cu ft per 80 lb bag (common manufacturer yields).
  • 10% overage is a common allowance for uneven subgrade and spillage.

What this does not cover

  • Reinforcement, forms, base preparation, and finish are not estimated.
  • Large pours are usually more economical as ready-mix — bag counts are shown for comparison only.

Planning aid only — not a quote. Quantities use documented rules of thumb; verify against your plans, local codes, site conditions, and real supplier pricing before ordering or bidding.

Methodology

Concrete volume is length × width × thickness (thickness converted from inches to feet), giving cubic feet; divide by 27 for cubic yards. Overage — 10% is a common starting point — covers subgrade irregularities, spillage, and the last wheelbarrow. Bag equivalents use 0.6 cubic feet per 80 lb bag, which is the yield printed on standard concrete mix packaging. Ready-mix is typically ordered in quarter-yard increments; check your supplier.

Worked example: 20 × 10 ft slab at 4 in. thick, 10% overage

  1. Volume = 20 × 10 × (4 ÷ 12) = 66.7 cu ft
  2. With overage = 66.7 × 1.1 = 73.3 cu ft ÷ 27 = 2.72 cu yd
  3. Bag equivalent = ceil(73.3 ÷ 0.6) = 123 × 80 lb bags

Frequently asked questions

When should I order ready-mix instead of bags?

As a rough threshold, anything over about one cubic yard is cheaper and more consistent from a truck. Bagged pours also struggle to finish before the mix sets on warm days.

Does thickness include the base?

No. Enter the concrete thickness only. Gravel base depth is a separate takeoff — same volume math with your base depth.

Can Drevanto estimate a full concrete scope?

Yes — concrete flatwork is one of the 26 certified Instant assemblies, producing an editable estimate with materials, labor hours, and readiness checks.

Certified benchmark · 2026-08-21

In 520 certified profile-mode generations across 26 supported Instant assemblies on Windows (profile/AOT) and an Android API 36 emulator, supported jobs became editable estimates in a median of 0.028 seconds (rounded); the measured 95th percentile was 48.008 milliseconds (approximately 0.048 seconds), with 0 generative-AI provider calls.

median, supported jobs
0.028 sec
certified generations
520
supported assemblies
26
failures · 0 AI provider calls
0

Certified supported jobs only. Editable output; contractor pricing and field verification remain in control. Full methodology and results

See it run on your own jobs

The private Drevanto beta is the real, editable product — not a website demo. Apply, and we will follow up by email.